News

 
 
  • 04 july 2017
    At the Technoprom Forum, an agreement was signed between "Tornado Modular Systems" with "Siblitmash" and "Komintern"

    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

Back to the section

 


APCS of the two boilers of E-75-3.8-350 GM type of the bench-testing system, OJSC “Kaluga Turbine plant” in Turynino

The automatized management system of the boilers No. 4 & 5 (E-75-3,8-350 GM) of the bench-testing system of OJSC “Kaluga Turbine plant” (KTP) in Turynino-town has been manufactured and shipped.

OJSC “KTP” is one of Russia's largest manufacturers of equipment for power engineering. The production includes: steam turbines for an electric generator drives, drive steam turbines, modular turbo generators, steam geothermal turbines and power-generating units. In its 25-year history “KTP” had gained a rich technical experience and knowledge, which has resulted in design and production of more than three thousand units of energy equipment. The original turbine design, a reliable and efficient performance and a long-term operation of the equipment allows meeting the specific requirements of our customers. The total capacity of power plants installed in the Russian regions and 42 countries of far and near abroad is more than 20 GW.

“KTP” is part of the “Power Machines” electric machine-building concern.


 

 


Back to the section

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*