    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

The current projects

Current projects in development


ADCS of Ust’-Khantayskaya HPP ADCS of Ust’-Khantayskaya HPP

The scope of work: Design, DCS shipment, setup, assembling & commissioning.

Year of completion: 2017-2021

 
DCS design and assembly of the ash-pump station of Novosibirsk CHPP-5 are being performed DCS design and assembly of the ash-pump station of Novosibirsk CHPP-5 are being performed

The scope of work: Design, shipment, assembling.

Year of completion: 2016

 
Automatized management system of three boilers of E-65-3.9-440KT type of CHPP, OJSC “Kuchuksulphate” Automatized management system of three boilers of E-65-3.9-440KT type of CHPP, OJSC “Kuchuksulphate”

The scope of work: Design, shipment, assembling and commissioning.

Year of completion: 2016-2017

 
APCS of the two boilers of E-75-3.8-350 GM type of the bench-testing system, OJSC “Kaluga Turbine plant” in Turynino APCS of the two boilers of E-75-3.8-350 GM type of the bench-testing system, OJSC “Kaluga Turbine plant” in Turynino

The scope of work: Design, shipment, assembling and commissioning

Year of completion: 2016

 
APCS of the turbo units No. 1 & 2 of SDPP in Topar APCS of the turbo units No. 1 & 2 of SDPP in Topar

The scope of work: Design, system shipment, assembling and commissioning, training

Year of completion: 2015 – 2016

 
Semey electrical substation Semey electrical substation

The scope of work: Design, IATSECA1, shipment, assembling and commissioning, training.

Year of completion: 2015

 
Central transmitter-receiver station of failure preventing system of prefault information acquisition & transmission system for wide-area protection of Ust’-Kamenogorsk electrical substation Central transmitter-receiver station of failure preventing system of prefault information acquisition & transmission system for wide-area protection of Ust’-Kamenogorsk electrical substation

The scope of work: Design, shipment of CTRS1, Failure Preventing System, IATSECA, assembling and commissioning.

Year of completion: 2015

 
APCS of the turbo unit No. 8 of Jezkazgan CHPP APCS of the turbo unit No. 8 of Jezkazgan CHPP

The scope of work: Design, setup, assembling and commissioning

Year of completion: 2016

 
Reconstruction of the Balkhash CHPP with the installation of modern APCS of PT-30 & R-25/09 turbines Reconstruction of the Balkhash CHPP with the installation of modern APCS of PT-30 & R-25/09 turbines

The scope of work: Design, shipment, setup, assembling and commissioning

Year of completion: 2015 – 2016

 
APCS of the boiler unit No. 5 of Jezkazgan CHPP APCS of the boiler unit No. 5 of Jezkazgan CHPP

The scope of work: Design, shipment, setup, assembling and commissioning

Year of completion: 2016

 
Mendeleyevsk GeoTPP. DCS “Tornado-N” for APCS. Mendeleyevsk GeoTPP. DCS “Tornado-N” for APCS.

The scope of work:  Design, system shipment, old control system dismantling and APCS setup, assembling, training

Year of completion: 2016-2017

 

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*