    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

Back to the section

 


Integrated APCS of the boiler unit No. 5 of BKZ-220 type of CCHP (LLC “Yurginsky machine engineering plant”)

In 2007, the automation implementation of the boiler unit No. 5 of BKZ-220 type of CHPP (LLC “Yurginsky Machine Engineering Plant”) was performed by “Tornado Modular Systems” company. It corresponds to the normative documents, and was based mainly on the programmable tools and marginally on the local automation tools. The certain functions of measurement and remote control are performed with the help of the local automation tools (the reserve control system in the operational circuit of a group control desk, a part of measurement systems and control elements of the actuators located in place: shutting-down of the mechanisms, fuel oil supply to the injectors).

Юргинский машзавод

  • To monitor a current state and control the technological equipment on the monitors installed in the operational circuit of the group control desk the following information is provided to operator:
  • Symbolic circuits of different degrees of detail, which are the main control tool;
  • Graphs of the current changes of the parameters, retrospective view of the parameters and values ​​of the calculated parameters;
  • Record tables of the parameters to control a large quantity of parameters, which are grouped by the meaning; 
  • Histograms as a convenient tool for comparison of the parameters of the same type; 
  • Alarm to inform the operational staff about faults during technological processes, tripping of protections and interlocks, identified malfunctions in the APCS hardware.

The solutions on data organization, sequence its processing and types of storage are illustrated on Scheme (in Russian).

DB-scheme.gif



 

 


Back to the section

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*