News

 
 
  • 04 july 2017
    At the Technoprom Forum, an agreement was signed between "Tornado Modular Systems" with "Siblitmash" and "Komintern"

    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

Back to the section

 


Prefault information acquisition & transmission system for wide-area protection of power-generating unit No. 5 of Yuzhno-Sakhalinsk CHPP-1

In the summer of 2012 the specialists of the company have successfully completed adjustment of the prefault information acquisition & transmission system of the substations with voltage of 500 and 1150 kV of Yuzhno-Sakhalinsk of CHPP-1 of RAS Energy Systems of the East.

The system is designed on the basis of the Central Transmitter-receiver Station of Emergency Control Automatics (CTRS-ECA) manufactured by “Modular Systems Tornado” company.



 

 


Back to the section

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*