News

 
 
  • 04 july 2017
    At the Technoprom Forum, an agreement was signed between "Tornado Modular Systems" with "Siblitmash" and "Komintern"

    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

Reviews

Reviews and feedback on our projects


Governor of the Novosibirsk Region thanked Tornado team Governor of the Novosibirsk Region thanked Tornado team

The scope of work: Collaboration, organization.

Year of completion: 2016

 
Distributed control system of Bočac HPP was commissioned Distributed control system of Bočac HPP was commissioned

The scope of work: Design, system supply, assembling and commissioning, training.

Year of completion: 2016.

 
Biysk CHPP, OJSC “Biyskenergo” Biysk CHPP, OJSC “Biyskenergo”

Year of completion: 2002-2006, 2009-

 
 
OJSC “RAS Energy Systems of the East” OJSC “RAS Energy Systems of the East”

The scope of work: Design, system supply, assembling and commissioning, training.

Year of completion: 2012

 

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*