News

 
 
  • 04 july 2017
    At the Technoprom Forum, an agreement was signed between "Tornado Modular Systems" with "Siblitmash" and "Komintern"

    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

Local APCSs of power-generating units, turbo units and boiler units

The most significant local APCSs of power-generating units, turbo units and boiler units executed by “Tornado Modular Systems” company.


 
Laboratory equipment for the training center of OJSC “Technopark of Novosibirsk Akademgorodok” Laboratory equipment for the training center of OJSC “Technopark of Novosibirsk Akademgorodok”

The scope of work: Equipment supply, teaching aids development, training

Year of completion: 2015

 
Automatic control system of the turbo unit No. 5 and external power corrector of Nizhnekamsk CHPP Automatic control system of the turbo unit No. 5 and external power corrector of Nizhnekamsk CHPP

The scope of work: Design, system supply, assembling and commissioning, training

Year of completion: 2013 – 2015

 
APCS of die-casting APCS of die-casting

The scope of work: evelopment and production of specialized modules and software for die-casting machines, system shipment, assembling and commissioning, training

 
Temperature monitoring system of the turbo units No. 1-5 of Novosibirsk CHPP-5 Temperature monitoring system of the turbo units No. 1-5 of Novosibirsk CHPP-5

The scope of work: Design, system shipment, assembling and commissioning, training

Year of completion: 2014

 
APCS of water cleaning devices for boiler heating surfaces. Customer: Yimin CHPP (People's Republic of China) APCS of water cleaning devices for boiler heating surfaces.  Customer: Yimin CHPP (People's Republic of China)

The scope of work: Design, shipment, assembling and commissioning, training, service management

Year of completion: work is completed; the system is in commercial operation since 2001; batch production is prepared

 
APCS of fire-chamber water blasting devices and ducts of the Ep-670-140 boiler (Pljevlja TPP (Montenegro)) APCS of fire-chamber water blasting devices and ducts of the Ep-670-140 boiler (Pljevlja TPP (Montenegro))

The scope of work: Design, supply, assembling and commissioning, training, technical support.

Year of completion: work is completed; the system is in commercial operation since 2001

 
APCS of feeding and burning fuel, APCS of pneumatic caving in raw coal bunkers. Customer: Kostolac-B TPP (Serbia) APCS of feeding and burning fuel, APCS of pneumatic caving in raw coal bunkers. Customer: Kostolac-B TPP (Serbia)

The scope of work: Design, supply, assembling and commissioning, training, service management.

Year of completion: work is completed; the system is in commercial operation since 2001

 

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*