News

 
 
  • 04 july 2017
    At the Technoprom Forum, an agreement was signed between "Tornado Modular Systems" with "Siblitmash" and "Komintern"

    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

Back to the section

 


Mendeleyevsk GeoTPP

DCS “Tornado-N” for APCS of the geothermal electrical station as part of development of alternative power engineering at the Kurile Islands is implemented.

Development of the APCS software has been performed.


Name of item

Content

1. Location of construction

Mendeleyevsk GeoTPP, Kunashir Island

2. Type of construction

New construction on the territory of an operating enterprise

3. Stages of work

1. Development of the application software for the APCS

2. Adjustment of the application software for the APCS

4. Special conditions of construction

Dangerous manufacturing facility under control of Rostechnadzor of the Russian Federation in the area of ​​seismic activity

5. Facility characteristics

The designed facility consists of the following components:

- binary power unit manufactured by “Ormat Technologies, Inc”;

- geothermal field;

- two air compressors manufactured by “Atlas Copco”;

- auxiliary equipment;

- electrical equipment.

6. Development of the APCS application software

1. Development of the process station software (ISaGRAF).

2. Development of the visualization software (INTOUCH)

3. Development of a configuring database (MS SQL)

7. Adjustment of APCS application software at the construction facility

1. Adjustment of the process station software (ISaGRAF).

2. Adjustment of a visualization software (INTOUCH)

3. Adjustment of a configuring database (MS SQL)


The APCS commissioning and testing have been performed.


 

 


Back to the section

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*