News

 
 
  • 04 july 2017
    At the Technoprom Forum, an agreement was signed between "Tornado Modular Systems" with "Siblitmash" and "Komintern"

    The tripartite agreement provides for import substitution for components of the injection molding complex from SibLitMach in the field of industrial robots ("Comintern") and the control system ("Modular Tornado Systems") that will cover the entire production cycle of the LAP, including the management of industrial robots

All news
 
 

Back to the section

 


Technical re-equipment of management information system of the boiler units No. 6, 7 & 9 and the turbo units No. 5 & 6 of Barnaul CHPP-2

At present time, the CJSC “Tornado Modular Systems” performs a complete set of services (design, system shipment, assembling, commissioning and staff training) as a part of technical re-equipment of Barnaul CHPP-2.

The automated functions of the system are:

  • information functions including receiving, preprocessing and special processing, accumulation, storage and representation of information as well as performing information and computing tasks;
  • control functions including technological protections, independent interlocks and automatic control;
  • functions which provide the system efficiency;
  • functions which provide creation and maintenance of the system.


According to the operating modes, the functions of the system are divided as follows:

  • operative functions, related to current control, collection and representation of information, real time diagnostics and reconfiguration of schemes, as well as reporting for operational activities;
  • non-operative functions, not related directly to the rate of the process and include processing, storage, transmission and representation of information used in non-operational control, planning, maintenance, repairs, etc.


Automation object characteristics

The automation objects are boilers No. 6, 7 & 9 and turbines No. 5, 6.

Brief description of boilers No. 6 & 7:

  • type: BKZ-210-140-F;
  • main fuel: coal;
  • kindling fuel: fuel oil, natural gas;
  • exhausters: 2 pcs;
  • blower fans: 2 pcs;
  • ball drum mill: 2 pcs;
  • raw coal feeders: 2 pcs;
  • mill exhausters: 2 pcs;
  • pulverized coal feeders: 8 pcs.


Brief description of the boiler No. 9:

  • type: BKZ-210-140-F(G);
  • main fuel: natural gas;
  • exhausters: 2 pcs;
  • blower fans: 2 pcs;
  • exhausters of recirculation: 1 pcs.


Brief description of turbo units No. 5 & 6:

  • type: PT-60-120 / 13 / 1.2 manufactured by LMZ;
  • installed capacity: 60 MW;
  • steam pressure before the isolation valve: 130 kg / cm2;
  • steam temperature before the isolation valve: 555 °C;
  • steam consumption: 396 t / h;
  • regulated production and heat extraction.


 

 


Back to the section

A map of the projects executed by our company is displayed below.

You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]


View Tornado modular Systems on a larger map

 

* 

*

*