Integrated APCS of the power-generating units No. 4 & 5 of Yuzhno-Sakhalinsk CHPP-1
“Modular Systems Tornado” company has implemented APCS of the power-generating units No. 4 & 5 of Yuzhno-Sakhalinsk CHPP-1 located on Sakhalin Island. The APCS purpose is automation of electric power generation control of the main and auxiliary equipment of the power-generating unit. Due to the use of more advanced software and hardware, the automation provides the following advantages:
- Increase in reliability, efficiency, safety and lifetime of the equipment as a result of reduction of intensity of random vibrations of the technological process parameters;
- Implementation of more complex monitoring and control algorithms;
- Expansion of the APCS data functions;
- Improvement of the technological equipment and APCS diagnostics;
- Increase in lifetime and reliability of the system in case of its component failure and reduction of a severe accident risk;
- Reduction of the power-generating unit start-up time;
- Staff and energy equipment safety in case of an accident threat;
- Reduction of the power-generating unit idle time in a period of scheduled repairs and emergency shutdowns caused by increase of technical operation level;
- Improvement of the working conditions of the staff and prevention of human errors.
APCS of the power-generating unit No. 5 includes the following technological equipment:
- Two gas-turbine units of “LM6000 PD Sprint” series manufactured by “GE Aero Energy” company;
- Gas supply system;
- Chemical water cleaning system for maintenance of the “Sprint” system (LM6000 Gas-turbine unit) operation;
- Two air compressors of GA30 + AP-7.5 type manufactured by “Atlas Copco” company;
- Electrical & technical equipment.
Back to the section
A map of the projects executed by our company is displayed below.
You can also download the list of projects dated 1992-2017 [pdf, 328 Kb]
View Tornado modular Systems on a larger map