APCS of the boiler unit No. 5 of Jezkazgan CHPP
“Tornado Modular Systems” company has successfully completed design, shipment and adjustment of APCS of the boiler plant which provides the protection of equipment, technological control, remote control, automatic control as well as control and measuring devices & automatic equipment.The design had two stages. The work is performed in accordance with the approved timetable and technical assignment.
APCS of boiler unit No. 5 covers the following equipment:
- boiler unit;
- auxiliary equipment.
The boiler unit has the following components:
- PT-10 steam boiler with a drum and a superheater;
- auxiliary equipment and pipelines.